- All orders
- Petrol, diesel equipment. Generators
- Gas piston installations are required for an … (№ 2152047)
Order №2152047
Order published
Customer is ready to work with international suppliers
$15,000+
Gas piston installations are required for an …
Gas piston installations are required for an existing field.
1. 500 kW-1 MW gas piston units with a total capacity of 20 MW or more. The fuel is natural gas with a methane content of 80% or more. Electrical efficiency ranges from 42-44%. The noise level is up to 80 dB. Gas consumption at a nominal capacity of 300 m3/hour per 1 MW.
2. ASIC miners, SHA-256 algorithm, power consumption up to 5 kW.
The hashrate is the highest possible, we will consider all options. The total amount of electricity is 20 MW.
Delivery on an installment basis with a fixed cost increase.
Depends on the class and energy efficiency of the equipment.
Calls are accepted from 7:00 to 23:00 local time.
We consider offers from suppliers throughout Russia, China, Turkey, the UAE and the CIS countries.
Delivery to the Southern Federal District, the exact location is discussed directly
Category
Looking for suppliers from
Belarus
Akmola region
Almaty oblast
China
United Arab Emirates
Volga Federal district
The North-Western Federal district
Central Federal district
Thailand
Turkey
Deliver to
city
27
Order views
Similar ordersOrder categories Orders that have the same categories as an open order
Any questions?
Leave your phone number below and we will call you back.